Milton-Madison Bridge http://wfpl.org en New Milton-Madison Bridge Section To Be Hoisted Today http://wfpl.org/post/new-milton-madison-bridge-section-be-hoisted-today <P>Crews have begun a second major step in the replacement of the 82 year old Milton-Madison Bridge over the Ohio River.<p> <P>A 727-foot section of steel truss will be <A href="http://www.miltonmadisonbridge.com/wp-content/uploads/2012/09/Second-liftNR-9-5-12.pdf">hoisted into place</A> today on temporary piers alongside the existing bridge.<p> <P>The 2,000 ton section was preassembled on the Kentucky side of the river and is being floated to the site on barges.<p> <P>The Kentucky Transportation Cabinet’s Andrea Clifford says the process was to begin just after midnight, weather permitting Mon, 10 Sep 2012 12:30:00 +0000 Rick Howlett 1578 at http://wfpl.org New Milton-Madison Bridge Section To Be Hoisted Today Huge Milton-Madison Bridge Truss To Be Hoisted http://wfpl.org/post/huge-milton-madison-bridge-truss-be-hoisted <p>A&nbsp;major step in the <a href="http://www.miltonmadisonbridge.com/">replacement of the Milton-Madison Bridge</a> will begin today, &nbsp;weather permitting.</p><p>A 600-foot section of the bridge&rsquo;s new truss will be lifted onto temporary piers.</p><p>Andrea Clifford with the Kentucky Transportation Cabinet says the section, weighing more than&nbsp;1,700 tons, was constructed on a nearby barge</p> Mon, 25 Jun 2012 08:30:00 +0000 Rick Howlett 760 at http://wfpl.org Huge Milton-Madison Bridge Truss To Be Hoisted